RINA 5-Year Special Survey
Survey managed.
Class maintained.
Survey Overview
What is the RINA 5-Year Special Survey?
Classification Requirement
Dry Dock Required
NDT & Structural Checks
Full Documentation Package
Full Survey Scope
Prepared. Precise. Proactive.
Every phase of the 5-Year Special Survey is coordinated under a single DES project lead — from the first hold point notification to final class certificate issuance.
01
PRE-SURVEY - 60–90 DAYS OUT
Pre-Survey Planning & Dry Dock Preparation
02
IN DRY DOCK - ACTIVE SURVEY
Hull Inspection & Structural Assessment
03
NDT & WELD INSPECTION
Non-Destructive Testing & Repair Execution
04
AFLOAT SURVEYS - CONCURRENT
Machinery, Electrical & Safety Equipment Surveys
05
POST-SURVEY - CLOSE-OUT
Documentation, Certification & Class Endorsement
Why Choose us
A single point of contact.
Zero gaps in accountability.
Class Approved
Design Engineered Solutions delivers class-approved marine services with a focus on precision, compliance, and seamless execution. Working closely with captains, owner representatives, surveyors, and shipyards, we ensure every project is completed to classification standards with efficient coordination and attention to detail from start to finish.
On Time, Every Time
Survey windows are fixed, and dry dock delays are costly. Design Engineered Solutions delivers precise project coordination and execution, managing timelines, survey requirements, and technical operations with disciplined oversight to keep your vessel moving efficiently — not sitting in the yard longer than necessary.
Complete Documentation
We don't hand over a vessel with missing paperwork. Every gauging record, weld log, repair certificate, and form is compiled, reviewed, and submitted as a complete package. Your class certificate won't wait on outstanding items from us.
In-House Repair Capability
Transparent Progress Reporting
30+ Years of Experience
Our Process
From first contact to certified and underway.
01
Initial Scope Call
Direct conversation with our senior engineers. We review the vessel's class history, outstanding notations, and survey due window to define a preliminary scope and timeline.
02
Pre-Survey Planning
Dry dock confirmed, NDT contractor coordinated, Class Society notified. A complete pre-survey plan is issued to the captain with phase schedule and hold point dates.
03
Survey Execution
04
Documentation & Submission
Complete survey package compiled and submitted to Class Society. All class conditions cleared, outstanding items resolved, and certificate renewal tracked to issuance.
05
Class Endorsed & Underway
Survey Timing
Don't wait until the window is closing.
Class Society surveys have fixed due windows. Late engagement with a survey partner compresses the planning phase, increases dry dock costs, and risks leaving the vessel out of class. We recommend engaging DES no less than 90 days before the required dry dock date.